Switzerland's transport industry has a new shared charging network. ASTAG Charge was officially launched at AS-TAG in Thun. The platform connects existing charging points operated by transport companies and makes available capacity accessible to other businesses. At launch, the association reported around 100 companies, 200 charging points, and 60 locations. Source: ASTAG.
For electric trucks, this can extend the operational range. Operators who can charge at another company's facility while on route may no longer need to plan their entire tour around returning to their own depot. However, whether this works in individual cases depends on the available station and the actual time window.
Technical integration with the Utopia network is planned for December 1st. Until then, operators should carefully verify which charging points are already available through their access. An announced merger does not automatically mean all processes will work jointly from day one.
Before the first trip, several basic questions need to be clarified: Can the truck with trailer fit on the site? What charging capacity is available? Must a time slot be agreed upon, and how will billing work? Only when these points align can the charging stop be properly integrated into the route.
Shippers can also benefit if additional charging options facilitate electric operations at their facilities. However, this requires a realistic schedule with buffer time. A charging point on the map is not a guarantee that it will be available at the desired time. For regular transport operations, testing under normal working conditions is therefore worthwhile.
Drivers need clear, understandable information about the station. This includes access route, registration procedures, and a contact number for emergencies. Planning should also identify an alternative option in case the agreed charging stop becomes unavailable on short notice.
