Post-control follow-up is the structured process that closes the loop after an inspection, audit, or customs examination.
Source: https://www.iso.org/iso-9001-quality-management.html
Tools that match this term
You might also be interested in these terms
Passar replaces E-dec and NCTS. Passar 1.0 (export) is live, Passar 2.0 (import) starts from Q2 2026. Roadmap, ePortal registration, deadlines and FAQ — all on one page.
Weekly: Top news, industry facts and insights from the world of logistics – free.
Share your knowledge, ask follow-up questions, or add practical insights to this page. Every contribution is moderated before publication.