Moving a wind turbine nacelle, a bridge girder, or a prefabricated industrial unit by road means dealing with oversize transport: the carriage of loads whose length exceeds statutory normal dimensions.
Source: https://de.wikipedia.org/wiki/%C3%9Cbberl%C3%A4ngentransport
Tools that match this term
You might also be interested in these terms
Analyze all 11 Incoterms 2020: cost matrix, risk timeline, insurance gap detector and customs responsibility – free, no login required.
Weekly: Top news, industry facts and insights from the world of logistics – free.
Share your knowledge, ask follow-up questions, or add practical insights to this page. Every contribution is moderated before publication.