ETCS Level 2 operates through continuous radio communication between train and infrastructure via a Radio Block Centre (RBC), which transmits movement authorities and speed information in real time without relying on fixed trackside signals.
Source: https://en.wikipedia.org/wiki/European_Train_Control_System
Tools that match this term
You might also be interested in these terms
Weekly: Top news, industry facts and insights from the world of logistics – free.
Share your knowledge, ask follow-up questions, or add practical insights to this page. Every contribution is moderated before publication.