Within the planning cycle of a distribution center, anticipated shipping volume is determined: the quantity of goods expected to leave the dock within a defined timeframe—such as a week or month.
Source: https://www.sciencedirect.com/topics/engineering/shipping-volume
Tools that match this term
You might also be interested in these terms
Analyze all 11 Incoterms 2020: cost matrix, risk timeline, insurance gap detector and customs responsibility – free, no login required.
Weekly: Top news, industry facts and insights from the world of logistics – free.
Share your knowledge, ask follow-up questions, or add practical insights to this page. Every contribution is moderated before publication.