Vessel Berth Planning
Quelle: https://en.wikipedia.org/wiki/Container_terminal#Berth_scheduling
The process of assigning vessels to specific berths within a port, taking into account constraints such as arrival times, vessel size and draft, berth length, handling equipment availability, and operational capacities, with the goal of optimizing port efficiency, minimizing ship waiting times, and improving resource utilization.