Optimising crane utilisation and terminal throughput is the core purpose of smart yard crane scheduling: algorithms distribute handling orders across available cranes, accounting for vessel arrival times, container weights, storage slot positions, and live crane availability, then adjust assignments dynamically when disruptions or delays occur.
Source: https://www.sciencedirect.com/topics/engineering/yard-crane-scheduling
Tools that match this term
You might also be interested in these terms
Weekly: Top news, industry facts and insights from the world of logistics – free.
Share your knowledge, ask follow-up questions, or add practical insights to this page. Every contribution is moderated before publication.