GlossaryEN1 min readUpdated: Jun 25, 2026
Lifting Plans for Heavy Cargo Transport
When heavy cargo is to be moved—an industrial reactor, a power transformer, or an offshore structure—the responsible team draws up a detailed lifting plan before any hook goes up.
Quick Answer
Last updated: Published:
Source: https://www.imo.org/en/OurWork/Safety/LossPrevention/Pages/Heavy-Lift,-Project-Cargoes-and-Rapid-Environment-Assessment.aspx
Category
Incoterms 2020 Simulator: Who bears costs & risk?
Reading time
1 min
Words
118
Mentioned in
–
Definition & Explanation
When heavy cargo is to be moved—an industrial reactor, a power transformer, or an offshore structure—the responsible team draws up a detailed lifting plan before any hook goes up. This document specifies the load's weight and center of gravity, the required lifting equipment, rigging attachment points, lift angles, and all safety clearances to be observed. Every lift becomes traceable and legally accountable; on-site improvisation is ruled out. In project logistics, lifting plans are standard practice and are frequently required by ports and industrial sites as a formal condition for access or operating permits. They should not be confused with the transport plan, which governs the entire routing of a heavy consignment—a lifting plan addresses individual lift operations only.
Next steps
Matching tools and partners
Related Terms
You might also be interested in these terms
⚖️ ICC Incoterms 2020
Incoterms 2020 Simulator: Who bears costs & risk?
Analyze all 11 Incoterms 2020: cost matrix, risk timeline, insurance gap detector and customs responsibility – free, no login required.
Logistics knowledge straight to your inbox
Free · No password · Never a paywall. Weekly top news and facts from logistics.
Community Questions & Answers
Share your knowledge, ask follow-up questions, or add practical insights to this page. Every contribution is moderated before publication.
No community answers yet. Be the first.