Zum Inhalt springen

Lift-on/Lift-off (LoLo) Vessel Scheduling

Quelle: https://www.freightos.com/freight-resources/lift-on-lift-off-lolo/
The process of planning and scheduling sea vessels equipped with onboard crane systems (Lift-on/Lift-off), aiming to efficiently coordinate loading and unloading operations across multiple ports within specified time frames.
    Entry Not Found | Freight-Academy™