Lift-on/Lift-off (LoLo) Vessel Scheduling
Quelle: https://www.freightos.com/freight-resources/lift-on-lift-off-lolo/
The process of planning and scheduling sea vessels equipped with onboard crane systems (Lift-on/Lift-off), aiming to efficiently coordinate loading and unloading operations across multiple ports within specified time frames.
Related Terms
You might also be interested in these terms
⚖️ ICC Incoterms 2020
Incoterms 2020 Simulator: Who bears costs & risk?
Analyze all 11 Incoterms 2020: cost matrix, risk timeline, insurance gap detector and customs responsibility – free, no login required.