When a reefer container is lifted aboard a feeder vessel, the operational sequence starts immediately: placement in the designated reefer bay, connection to the vessel's electrical supply, and logged verification of the temperature setpoint before departure.
Source: https://www.gssc.net/logistics-glossary/feeder-vessel-reefer-cargo-handling
Tools that match this term
You might also be interested in these terms
Weekly: Top news, industry facts and insights from the world of logistics – free.
Content reviewed and editorially cleared.
Share your knowledge, ask follow-up questions, or add practical insights to this page. Every contribution is moderated before publication.