When a Swiss freight forwarder moves a wind turbine component, an industrial vessel, or heavy construction equipment, over-height transport rules apply the moment the combined height of vehicle and load exceeds 4.00 metres.
Source: https://en.wikipedia.org/wiki/Oversize_load
Matching tools and partners
You might also be interested in these terms
Analyze all 11 Incoterms 2020: cost matrix, risk timeline, insurance gap detector and customs responsibility – free, no login required.
Verified forwarders, ranked by coverage and profile — premium capped at 10%.
Free · No password · Never a paywall. Weekly top news and facts from logistics.
Content reviewed and editorially cleared.
Share your knowledge, ask follow-up questions, or add practical insights to this page. Every contribution is moderated before publication.