{"@context":"https://schema.org","@type":"Place","additionalType":"https://schema.org/Port","name":"Puerto Limon","identifier":"CR LIO","unlocode":"CR LIO","city":null,"country":"Costa Rica","waterBody":"Caribbean Sea; North Atlantic Ocean","harborSize":"Very Small","harborType":"Coastal (Breakwater)","channelDepthMeters":11.5,"confidenceLevel":null,"coordinates":{"latitude":9.983333,"longitude":-83.016667},"description":"Costa Rica's largest-ever infrastructure project began in 2011, when APM Terminals won a 33-year concession to build and run the Moín Container Terminal (TCM); first-phase operations started in 2019. The terminal occupies an artificial island of about 80 hectares roughly 500 m off the Caribbean coast, with 650 m of quay, two berths at 14.5 m depth, a 1,500 m breakwater, an 18 m channel and six super-post-Panamax gantry cranes. Annual capacity is around 1.2m TEU, making Limón/Moín Costa Rica's pr","url":"https://www.freight-academy.com/en/information/seaports/puerto-limon-port-cr-lio","markdownMirror":"https://www.freight-academy.com/api/md/seaports/en/puerto-limon-port-cr-lio","source":null,"provider":{"@type":"Organization","name":"Freight Academy","url":"https://www.freight-academy.com"},"quickSummary":"Puerto Limon · (UN/LOCODE: CR LIO) · Costa Rica · Very Small · 11.5 m"}