{"@context":"https://schema.org","@type":"Airport","name":"New Gwadar International Airport","iataCode":"GWD","icaoCode":"OPGD","city":"Gurandani","country":"PK","airportType":"medium_airport","cargoCapable":true,"cargoRank":null,"confidenceLevel":null,"coordinates":{"latitude":25.296733,"longitude":62.498822},"elevationMeters":19,"runwayLengthMeters":null,"description":"Opened in October 2024 with a USD 230 million Chinese grant, New Gwadar International Airport (GWD) was built well ahead of the traffic it will eventually need. Sitting northeast of the deep-sea port of Gwadar in Balochistan, it is a flagship project of the China-Pakistan Economic Corridor (CPEC), with a 3,658-metre runway able to handle the largest freighters in service, up to the Airbus A380 and Boeing 747-8. Plans size the field for around 30,000 tonnes of cargo, backed by a dedicated air-car","url":"https://www.freight-academy.com/en/information/airports/new-gwadar-international-airport-gwd","markdownMirror":"https://www.freight-academy.com/api/md/airports/en/new-gwadar-international-airport-gwd","provider":{"@type":"Organization","name":"Frachtportal","url":"https://www.freight-academy.com"},"quickSummary":"New Gwadar International Airport · (IATA: GWD) · Gurandani, PK · 19 m · Cargo Hub"}